OB4 delivered 15 July 05; see 2005 calendar.
Technical Interchange Meeting held
in Boulder 13 Jun 06.
MOU Mod 3 included support for the items noted below.
| Task | Est. effort person-weeks |
Status | Work Element A (ISB) |
|---|---|---|
| Merge with AWIPS OB4 | 22.5 | completed 12/04 and running on GSD test system; delivered to L-M 7/05 |
| Stage ORPG Build 6 (Linux) | 4.5 | running on ax-avs; delivered to L-M 7/05 |
| Stage and test on RedHat Enterprise AS2.1 | 12.5 | running at GSD since 1/05 |
| Field mill tabular text | 17.25 | running at GSD; delivered to L-M 7/05 |
| Briefing Tool enhancements | 21 | running at GSD | Work Element B (FAB) |
| LAPS enhancements - new datasets | 24 | v2.2 delivered 7/04; v3.0 expected 7/05 |
| MM5 enhancements | 12 | |
| LAPS/MM5 maintenance, troubleshooting, technical support | 10 | ongoing |
| LAPS/MM5 year-end report | 2 |
The global line width and texture and background color features developed for RSA were merged into the AWIPS baseline in OB5.
| Task | Person-weeks | Target date | Status |
|---|---|---|---|
| Work Element A (ISB) | |||
| Merge with AWIPS OB5 - create RSA release | 5.75 | Oct 05 | skipped - moved directly to OB6 |
| Merge RSA features into AWIPS OB7 | 12.5 | July 05 | merge complete |
| Merge with AWIPS OB6 - create RSA release | 5.75 | Feb 06 | completed 7/05, but never staged |
| Build and test ORPG7 for RSA use | 3.75 | Oct 05 | skipped - moved directly to ORPG8 |
| Build and test ORPG8 for RSA use | 3.75 | Feb 06 | ORPG8 running at GSD, but not yet used for RSA |
| D2D maintenance, problem reports, and support | 16.5 | ongoing | |
| Work Element B (FAB) | |||
| Model upgrade and support | 43 | ongoing | |
| Implement 30-min LAPS cycle | Oct 05 | Install verification system | 6 | Oct 05 |
| Preliminary WRF testing | 9 | Feb 06 | |
Continuing maintenance FY07.
| Task | Status |
|---|---|
| ER localization | 5.2.2a |
| Enhancement -- export to D2D to briefing tool | 5.2.2a |
| Enhancement -- multi-color range ring background | 5.2.2a |
| Range Ring upgrades | 5.2.2a |
| Enhancement -- RedHat 7.2 | 5.2.2a |
| Enhancement -- AWIPS 5.2.2 | 5.2.2a |
| Level II radar ingest | |
| Level III radar ingest | 5.2.2g |
| Informix and text workstation | 5.2.2a |
| MDPI/WINDEX | 5.2.2 |
| Enhancement -- split LDAD data sets into different directories | 5.2.2a |
| Enhancement -- Tabular text thresholding | 5.2.2a |
| Tall Tower ingest and display | 5.2.2a |
| Enhancement -- RedHat 7.3 | 5.2.2a |
| Enhancement -- new templates for ER briefings | 5.2.2a |
| Documentation for 5.2.2a delivery | /5/03 |
| Task | Status |
|---|---|
| LDAR prototype | delivered w/OB1, December |
| LPLWS (field mill) | delivered |
| contouring wind divergence | delivered |
| LLP (CGLSS) | delivered |
| User Towers | Complete 5.2.2a (LC 39A/B, LC40) |
| Prototype for Remote system | Not started |
| Text RAOB | Removed as req't per Dave Sautter |
| Add additional tower data sets | Not started |
| Task | Status |
|---|---|
| complete LDAR | 29 Apr 03 TIM |
| Final Remote system | |
| Neuman-Pfeffer Index replacement | |
| Radio Theodolite | |
| TAF ingest and decode | Removed as req't per David Sautter |
| 74C | Prototype in Briefing Tool |
| AMU installation |
| David Sautter | LM Project Manager | 805-614-3689 |
| Lowell Schaffert | System Engineer | 805-348-2227 |
| David Flynt | System Install | 805-348-2360 |
| Dana Andersen | Network | 805-614-3520 |
| SITSF | 805-614-3555 | |
| Charlotte Johnson | SLRSC | 805-606-6713 |
| VBG ROC | 805-606-3358 | |
| Jackie Petit | ER support | 321-853-8342 |
| Tim Wilfong | ENSCO | 303-443-0811 wk/home 805-878-5131 cell |
| Room 140 at ER ROC | 321-853-7999 |