| ER localization | complete |
| Tabular point data | being tested |
| Enhancement -- export to D2D to briefing tool | Waiting for test plans |
| Enhancement -- multi-color range ring background | Complete |
| Range Ring upgrades | Testing |
| Enhancement -- RedHat 7.2 | Staged at FSL |
| Enhancement -- AWIPS 5.2.2 | Creating regression test plan |
| Level II radar ingest | Staged and testing |
| Level III radar ingest | Staged and testing |
| Informix and text workstation | Staged and testing |
| MDPI/WINDX | Waiting for user feedback |
| Enhancement -- split LDAD data sets into different directories | Staging |
| Enhancement -- Tabular text thresholding | Waiting for test plans |
| Tall Tower ingest and display | Part of split LDAD data sets |
| LDAR prototype | Design review, 9/23 with ENSCO, LMCO |
| LPLWS (field mill) | Design review, 9/24 with LMCO,ENSCO |
| contouring wind divergence | Waiting on response from Clay Flinn |
| LLP (CGLSS) | Requirements review, 9/20.02 |
| 74C | Contacted ER POC |
| User Towers | Not started |
| Prototype for Remote system | Not started |
| Text RAOB | Not started |
| complete LDAR |
| Final Remote system |
| Neuman-Pfeffer Index replacement |
| Radio Theodolite |
| TAF ingest and decode |
| 27 Jan | 28 | 29 | 30
Herb on-site help |
31
Herb on-site help |
1
Herb on-site help Status Meeting (1/25/02) |
2
Darien on-site help |
| 3
Darien on-site help |
4 | 5 | 6 | 7 | 8 | 9 |
| 10 | 11 | 12 | 13 | 14
Status Meeting |
15
Info on two-heads sent to LM (Wakefield) |
16 |
| 17 | 18
Joe on-site help |
19
Joe on-site help |
20
Joe on-site help |
21
Joe on-site help |
22
Joe on-site help |
23 |
| 24 | 25
Darien on-site help |
26
Darien on-site help |
27
Darien on-site help |
28 |
| 1 | 2 | |||||
| 3 | 4 | 5 | 6 | 7
Deliver rsa_512k |
8 | 9 |
| 10 | 11 | 12 | 13 | 14 | 15 | 16 |
| 17 | 18
Start of testing dry run Delivered rsa_512l |
19
Joe Wakefield on site help |
20
Joe Wakefield on site help |
21
Joe Wakefield on site help |
22
Joe Wakefield on site help |
23 |
| 24 | 25
Continued testing dry run |
26
Darien on-site help |
27
Darien on-site help |
28
Darien on-site help |
29
Darien on-site help |
30 |
| 31 |
| 1 | 2 | 3
Darien on-site help |
4
Darien on-site help |
5
Darien on-site help |
6 | |
| 7 | 8 | 9 | 10 | 11
rsa-512m delivery (via email) |
12 | 13 |
| 14 | 15
Susan on-site help |
16
Susan on-site help |
17
Susan on-site help |
18
Susan on-site help |
19
Susan on-site help |
20 |
| 21 | 22
Joe on-site help |
23
Joe on-site help |
24
Joe on-site help |
25
Joe on-site help |
26
Joe on-site help rsa_512n delivery |
27 |
| 28 | 29 | 30
7.2 RH upgrade on ws1-avs RSA 5.1.2 merged into RSA 5.2.2 |
| 1 | 2 | 3 | 4 | |||
| 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| 12 | 13 | 14 | 15 | 16 | 17 | 18 |
| 19 | 20 | 21
Ensco/LM onsite design discussion |
22
rsa_512o delivery |
23 | 24
end of ENSCO/LM onsite design discussions |
25 |
| 26 | 27 | 28 | 29 | 30 | 31
Delivery of user guide, smm docs |
| 1 | ||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20
AWIPS 5.2.2 RSA 5.2.2 merge |
21 | 22 |
| 23 | 24 | 25 | 26 | 27 | 28 | 29 |
| 30 |
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 7 | 8 | 9
onsite TIM |
10
onsite TIM |
11
onsite TIM |
12 | 13 |
| 14 | 15 | 16 | 17 | 18 | 19 | 20 |
| 21 | 22
bdds/orpg running mdorpg |
23 | 24
Upgraded DS to RH 7.2 |
25 | 26
Installed RSA5.2.2 with ER localize |
27 |
| 28 | 29 | 30 | 31
Storing ORPG data on mdorpg |
| 1 | 2 | 3 | ||||
| 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| 11 | 12
Status meeting |
13
New designs posted |
14 | 15 | 16 | 17 |
| 18 | 19 | 20 | 21 | 22
LDAR ingest reqs review |
23 | 24 |
| 25 | 26 | 27 | 28 | 29
RSA 5.1.2R delivered |
30 | 31 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 8 | 9 | 10 | 11 | 12
LPLWS reqs review LDAR design review |
13
5.2.2 staged |
14 |
| 15 | 16
Status meeting |
17 | 18 | 19 | 20
LLP (CGLSS) reqs review |
21 |
| 22 | 23
CDR ENSCO |
24
CDR ENSCO 5.2.2 Charlotte |
25
CDR ENSCO 5.2.2 Charlotte |
26
5.2.2 Charlotte |
27
5.2.2 Charlotte |
28 |
| 29 | 30 |
| Tim Wilfong | Project Manager | 805-348-2386 wk | 805-878-5131 cell |
| Charlotte Johnson | AWIPS testing | 805-348-2136 | |
| Lowell Schaffert | System Engineer | 805-348-2227 | |
| David Flynt | System Install | 805-348-2360 | |
| Andy McDonald | System Install | 805-348-2112 | |
| Dana Andersen | Network | 805-614-3520 | |
| ROC | 805-606-3358 | ||
| SITSF | 805-614-3555 |