WFO Advanced Build 4.2 Requirements


Set of requirements for FSL's portion of AWIPS Build 4.2

Carl Bullock/Darien Davis

June 1998


Synopsis 

The NWS plans to start removing existing systems such as AFOS, SWIS (satellite display), and WSR-88D PUP during the AWIPS Build 4 time frame. In order to accomplish this, AWIPS Build 4.2 must have the critical capabilities of these systems or their functional equivalents. AWIPS Build 4.2 is a joint development effort, with FSL, Office of Hydrology, Techniques Development Laboratory, and PRC all contributing software; only FSL requirements are addressed in this document. Highlights of this build are:


Objective

Provide NWS with a reliable, highly functional system, which can be used by forecasters and hydromet technicians to perform their duties and allow NWS to begin removing existing systems.


Schedule - dates will slip due to PCMS transition at FSL

July 31, 1998 - Software development freeze, begin integration testing

August 17, 1998 - Deploy to Denver for operational shakedown

August 31, 1998 - Handoff to NWS

October 1, 1998 - Handoff to PRC?