Instructions for Using the Hurricane Display Capabilities

 
Last update on March 9, 2000
These instructions will  help the tester and developer use the Hurricane Display on the graphics workstation.

1.0 Capabilities
The Hurricane Display decodes hurricane text messages and displays them in the D-2D graphics window.

1.1 Running

There are two ways to run the Hurricane Display.


2.0  Display Operations

Selecting "Hurricane" in the "Surface" menu, the "Hurricane" submenu will pop up. There are five parts selection buttons  in the this submenu, the Track Summaries, Position Update, Model Guidance, 12hr Strike Probabilities, and 48hr Strike Probabilities.

2.1 Track Summaries

The "Atlantic", "E Pacific", "W Pacific" and "Hourly forecasts" buttons display the TCM/TCP products.

2.2  Position Update

The "Atlantic", "E Pacific" and "W Pacific" buttons display the TAP products.
Selecting the "Atlantic", "E Pacific", or "W Pacific" button, plots the positions of the current tropical system and its name.  It uses standard meteorological symbols for depressions, storms, hurricanes and extratropical systems.

2.3  Model Guidance

The "CHGHUR Guidance" and "CHGQLM Guidance" buttons display the CHG forecast products

2.4  12hr Strike Probabilities
The AT1 to AT5  buttons are different tropical systems. Selecting one, will display a SPF product by plots the current position using meteorological symbols,  the possible future positions with 12 hours strike probability in a frame

2.5  48hr Strike Probabilities
This is same as 2.4, except the forecast time is 48 hours.